Logo de Viscount Cruises

"Des bateaux pour toutes les occasions."

Jetée de Embankment

Embankment Pier, Victoria Embankment

À propos de la jetée de Embankment

Embankment Pier est situé sur la rive nord de la Tamise, à côté du pont ferroviaire de Charing Cross et de la gare Embankment.

Embankment Pier se trouve à quelques pas de Westminster Pier, de Villiers Street, du Strand et d'un certain nombre de monuments célèbres.

Les sites d'intérêt à proximité de Embankment Pier incluent Cleopatra's Needle, l'hôtel Savoy, Somerset House et le nouveau palais de Westminster (Chambres du Parlement).

Address

Read More About Embankment Pier

News

Easter Holidays 2020

Easter Holidays 2020

Easter is a great time to explore London & there is a wide range of family activities & events taking place at different attractions across the city.

Read More »
Greenwich Pier (Cutty Sark), Royal Borough of Greenwich

Greenwich Pier Closures – 19th, 20th, 27th & 28th February

Transport for London are conducting a major renovation of Greenwich Pier between November 2017 and March 2018. The renovation is expected to increase the pier’s lifespan by a decade and will involve the pontoons being removed in two phases. Some of the works which will be carried out include replacing the anchor chains, refurbishing the connection hinges between the pontoons, repairs to the main decks and a fresh coat of paint below the waterline Greenwich Pier will be closed for four days during February. Find out about the Greenwich Pier Renovation February Closure Dates Monday 19th February 2018 – All Day Tuesday 20th February 2018 – All Day Tuesday 27th February 2018 – All Day Wednesday 28th February 2018 – All Day Thames River Services There will be no Thames River Services trips to Greenwich on the above dates. Services between Westminster Pier & Greenwich Pier will resume on Wednesday 21st February after the first closure and on Thursday 29th February after the second closure. Circular Cruise Westminster Circular Cruise Westminster will still be operating services from Westminster to St. Katharine Pier calling at Embankment Pier, Festival Pier & Bankside Pier. Visit the Circular Cruise Website About Thames River Services Thames

Read More »
Greenwich Pier (Cutty Sark), Royal Borough of Greenwich

Greenwich Pier Closure – Friday 24th November

About the Renovation Transport for London are conducting a major renovation of Greenwich Pier between November 2017 and March 2018. The renovation is expected to increase the pier’s lifespan by a decade and will involve the pontoons being removed in two phases. Some of the works which will be carried out include replacing the anchor chains, refurbishing the connection hinges between the pontoons, repairs to the main decks and a fresh coat of paint below the waterline Find out about the Greenwich Pier Renovation Pier Closures Greenwich Pier will be closed all day on Friday 24th November and for part of the day on Saturday 25th November. Friday 24th November 2018 – All Day Saturday 25th November 2018 – Pier Reopens at 12:00 Thames River Services There will be no Thames River Services trips to Greenwich on Friday 24th November, the pier is expected to re-open after 12:00 on Saturday 25th November. Services between Westminster Pier & Greenwich Pier will resume when the pier reopens on Saturday afternoon. Circular Cruise Westminster Circular Cruise Westminster will still be operating services from Westminster to St. Katharine Pier calling at Embankment Pier, Festival Pier & Bankside Pier. Visit the Circular Cruise Website About Thames River Services

Read More »
fr_FRFrançais