
Greenwich Pier Closure – Friday 24th November
About the Renovation Transport for London are conducting a major renovation of Greenwich Pier between November 2017 and March 2018. The renovation is expected to increase the pier’s lifespan by a decade and will involve the pontoons being removed in two phases. Some of the works which will be carried out include replacing the anchor chains, refurbishing the connection hinges between the pontoons, repairs to the main decks and a fresh coat of paint below the waterline Find out about the Greenwich Pier Renovation Pier Closures Greenwich Pier will be closed all day on Friday 24th November and for part of the day on Saturday 25th November. Friday 24th November 2018 – All Day Saturday 25th November 2018 – Pier Reopens at 12:00 Thames River Services There will be no Thames River Services trips to Greenwich on Friday 24th November, the pier is expected to re-open after 12:00 on Saturday 25th November. Services between Westminster Pier & Greenwich Pier will resume when the pier reopens on Saturday afternoon. Circular Cruise Westminster Circular Cruise Westminster will still be operating services from Westminster to St. Katharine Pier calling at Embankment Pier, Festival Pier & Bankside Pier. Visit the Circular Cruise Website About Thames River Services